Cómo mejorar la eficacia del trabajo del equipo de atornillado durante la construcción

Jul 23, 2022

The anchoring rig is mainly used for the sliding wave treatment engineering of railways, highways, water conservancy and hydropower facilities and the anchoring engineering of dangerous rock masses, the anchoring engineering of high slope rock mass such as the control of building displacement, and also used for the construction of urban deep foundation pit support and foundation. Reinforcement engineering holes, blasting holes for blasting engineering and tunnel pipe shed support holes, etc.


It has good performance: compact structure, small size, light weight, flexible maneuverability, suitable for working on high slopes and scaffolding; the output torque of the hydraulic power head is large, the drilling capacity is strong, and the drilling rig is widely used; The output speed of the power head is infinitely variable, and the drilling parameters can be independently selected according to different construction requirements and geological conditions to achieve the best drilling efficiency.


Therefore, no matter what type of anchoring rig, the hydraulic transmission system is an important part of the anchoring rig equipment. If it is improperly maintained, various failures will occur, which will seriously affect the normal operation of the equipment. Therefore, great attention should be paid to the maintenance of the hydraulic system. Work.


The possible failures of the hydraulic system are various. Most of the failures during use are caused by improper selection of oil, contaminated oil, air entering the system and excessive oil temperature.


The following analyzes how to properly store the hydraulic bolting rig.


02.jpg


1. It should be parked in a dry room. Those who have to park outdoors should choose a flat ground and cover it with wooden boards. Cover with a cloth cover after parking.


2. Before long-term storage, the hydraulic rock bolt must be maintained, repaired to damaged parts, and thoroughly cleaned to keep it in good technical condition.


3. The arrangement and arrangement in the parking lot should ensure that the entry and exit of any hydraulic rock bolt drilling rig is not affected by other hydraulic rock bolt drilling rigs.


4. The fuel control lever of the hydraulic rock bolt drill should be placed in the idle position, and each control lever should be placed in the neutral position.


5, the storage of the engine.


The hydraulic rock bolt has a certain improvement in its service life. Due to its high performance, when it is in use, it can better allow users to reduce their own use costs, and it is in its own efficiency. It is very high, so that it can bring great benefits to users when it is working.


Contacte con un experto en productos

Sólo tiene que rellenar el siguiente formulario y un experto en productos de Hengwang se pondrá en contacto con usted en tiempo.

Pregunte ahora y disfrute de una promoción de productos del 3%